Temporal dimension - AIM-Hub: Difference between revisions
Jump to navigation
Jump to search
m (1 revision imported) |
m (Text replacement - "IsDocumentationOf=AIM-CGE" to "IsDocumentationOf=AIM-Hub") |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ModelDocumentationTemplate | {{ModelDocumentationTemplate | ||
|IsDocumentationOf=AIM- | |IsDocumentationOf=AIM-Hub | ||
|IsEmpty=No | |IsEmpty=No | ||
|DocumentationCategory=Temporal dimension | |DocumentationCategory=Temporal dimension | ||
}} | }} | ||
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. | In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year. |
Latest revision as of 14:19, 15 June 2020
Corresponding documentation | |
---|---|
Previous versions | |
Model information | |
Model link | |
Institution | National Institute for Environmental Studies (NIES), Japan, https://www.nies.go.jp/index-e.html., Kyoto-University (Kyoto-University), Japan, https://www.kyoto-u.ac.jp/en. |
Solution concept | General equilibrium (closed economy) |
Solution method | Simulation |
Anticipation |
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.