Temporal dimension - POLES: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 4: | Line 4: | ||
}} | }} | ||
The model runs with a 1 year time step, usually from 1990 to 2050, the 1990-2015 period being almost entirely set by data and used for calibration. In the context of the ADVANCE project it has been run up to 2100. |
Latest revision as of 16:53, 22 December 2016
Corresponding documentation | |
---|---|
Previous versions | |
Model information | |
Model link | |
Institution | JRC - Joint Research Centre - European Commission (EC-JRC), Belgium, http://ec.europa.eu/jrc/en/. |
Solution concept | Partial equilibrium (price elastic demand) |
Solution method | SimulationRecursive simulation |
Anticipation | Myopic |
The model runs with a 1 year time step, usually from 1990 to 2050, the 1990-2015 period being almost entirely set by data and used for calibration. In the context of the ADVANCE project it has been run up to 2100.