Temporal dimension - AIM-Hub: Difference between revisions
Jump to navigation
Jump to search
m (1 revision imported) |
No edit summary |
||
Line 4: | Line 4: | ||
|DocumentationCategory=Temporal dimension | |DocumentationCategory=Temporal dimension | ||
}} | }} | ||
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. | In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year. |
Revision as of 09:43, 7 December 2016
Corresponding documentation | |
---|---|
Previous versions | |
Model information | |
Model link | |
Institution | National Institute for Environmental Studies (NIES), Japan, https://www.nies.go.jp/index-e.html., Kyoto-University (Kyoto-University), Japan, https://www.kyoto-u.ac.jp/en. |
Solution concept | General equilibrium (closed economy) |
Solution method | Simulation |
Anticipation |
In terms of temporal scale, the base year of AIM/CGE is 2005. AIM/CGE can be run for the 2005--2100 period. For some applications, the model is run up to 2050. The time step of the model solution is one year.